During construction J.H. Cockerell were engaged by Council as the Contract’s Superintendent and to also provide quality control inspections for work they designed which included the following:
- 50m x 25m fully tiled swimming pool
- 19m x 13m Splashpad
- 15.5m x 7.5m fully tiled and heated indoor learn to swim pool
- Shade structures to both the 50m pool and Splashpad
- Plant rooms and storage facilities
- Swim Club and Control Room
- Covered picnic shelters
The Emerald Aquatic Centre upgrade completed successfully to the community‘s satisfaction.